A complete project.
From land to harvest.
We design the installation, civil works and operating approach together. Every decision belongs to the same plan.

Before choosing equipment,
we define the investment.
A new installation is an opportunity to put things in the right order.
We clarify crops, capacity, intake rhythm, conditioning and dispatch. We review the site and budget before fixing the configuration.
We then coordinate the process flow with foundations, hardstanding, intake, utilities and access. Future development stages can be considered at concept level.
Investment brief
What the installation must achieve, what volume it handles and how it fits into farm operations.
Integrated configuration
Intake, drying if needed, conveying, storage, aeration, monitoring and dispatch.
Implementation plan
Budget, stages, documentation, civil works, equipment and delivery coordination.
The connection between
technology and construction.
- 01Flow and capacities
Coordinated throughputs, batch separation and simultaneous operation scenarios.
- 02Civil infrastructure
Foundations, intake pits, hardstanding, drainage and utility interfaces to the agreed brief.
- 03Operation and maintenance
Equipment access, working and maintenance space, and training agreed within the project.
- 04Next stages
Site reserves and expansion possibilities assessed from the start.
A warehouse can also be part of the project.
We assess silos, warehouses and combined configurations according to the farm's needs. Integration starts with intake and handling and continues through storage to dispatch.