GUIDE · PROCESS FLOW

Where can an installation bottleneck?

Why intake, drying, conveying and storage need to be sized together.

Belt conveyor in an AGI gallery
Official AGI photograph. Equipment and installations from the AGI portfolio.TECHNOLOGY WORKING FOR YOUR FARM

Every stage affects plant throughput. A high rating on one equipment datasheet does not by itself tell you what the whole system can process.

Intake has its own rhythm.

Arrival surges, positioning and unloading time and intake capacity affect vehicle turnaround. The brief should describe peak activity, not just daily averages.

Compare drying under the same conditions.

Product, incoming and final moisture and ambient conditions change processing capacity. Compare options only after these assumptions are clear.

Conveying connects every operation.

Length, lifting height, feeding and discharge points affect selection. Discuss which operations need to run simultaneously: intake, transfer between cells or dispatch.

A simple exercise: follow a trailer load from entry to the storage cell. Then follow the product from the cell to dispatch.

Buffer capacity can change how you operate.

Intermediate storage can help coordinate stages with different rhythms. Its sizing and use must be integrated into the design according to product and storage conditions.

Operation and maintenance are part of the flow.

Cleaning, batch changes, inspections and planned shutdowns take time. A realistic brief includes them before the final configuration is selected.

Indicative guidance for preparing a brief. Sizing, verification and construction solutions require actual project data.

THE FIRST STEP, TOGETHER

Let's start with your farm.

Tell us what you want to build, expand or improve. The initial technical discussion is free.

No obligation to buy. We begin by understanding your project.